Author Topic: Train rebuild  (Read 83 times)

Hammerhead

  • Guest
Train rebuild
« on: December 31, 2001, 04:21:00 AM »
Whilst flying offline, I blow up one or more f the trains bogies. Obviously, the following bogies stop and the previous bogies and engine keep moving. After about a minute though, the entire train regenerates at the point to where the locomotive has reached. This (in my opinion) is not so good, and should require a longer time to do so. I tried with downtime at 200(MAX) butit still happens. Perhaps the regenerating train should not happen at all. The loco continues to its destinaion and then does the return trip with the full train. Also bomb craters should be capable to stop trains (as no rails left) and should derail them.  :D   :D

Offline chad

  • Zinc Member
  • *
  • Posts: 52
      • http://None
Train rebuild
« Reply #1 on: December 31, 2001, 07:09:00 AM »
A couple of things need to be fixed this this with the resupply system.

Here my List

Train & trucks go slower!
Train & Trucks need to be easly killed
Train & Trucks, should be damaged if Rail or Road in bombed. This bomb damage will take the train or truck one trip to repair. Unless a C47 drops goons to repair the track. This will enable bombers to bomber the rail way, with oww lets say 20 250lb bombs and the train will require 20 trips to repair the current line.

Just a thought