First, if the word came down from HTC to re-model the Panzer IV H, just how much time would it take in man-hours to start from scratch?
Second, for the newly remodeled gv/aircraft in AH (zekes, Panther, F6F, Tyhoon, etc), just how many han hours go into making the new skins???
Im just curious. I know how much time it took me to simply begin when looking at the old M3, I can only imagine how long it takes from start to finish.
-
I'd imagine the Panzer IV H would take less man hours than most other GVs since HTC could borrow most of the 3D shape of the hull from the Wirblewind.
It typically takes me about 3-4 weeks to do a skin for HTC, longest was 6 weeks. Some skins are more complex than others and occasionally some reskinning is needed where a bug in the 3D shape has been corrected.
I've never worked out what that is in man hours. I do most of my skinning for an hour or two each morning before anyone else gets up. Its quiet then and my brain seems to work a lot better then than in the evening. Sometimes I'll spend a day off doing it too.