Visited the ME-262 project hangar. The first 262 is having the gear doors installed and is very near completion. Five ME-262s are being built. The first test flight will be this summer. The engines are GE J-85s. Their web site is
http://www.stormbirds.com.I was fortunate enough to be allowed pictures only after agreeing not to post them, so sorry, no pictures.
