Louisiana has received more money for Corps civil works projects than any other state, $1.9 billion; California came in second with $1.4 billion
How much do you suppose they will waste after the flood?
Link The Industrial Canal lock is one of the agency's most controversial projects, sued by residents of a New Orleans low-income black neighborhood and cited by an alliance of environmentalists and taxpayer advocates as the fifth-worst current Corps boondoggle. In 1998, the Corps justified its plan to build a new lock -- rather than fix the old lock for a tiny fraction of the cost -- by predicting huge increases in barge traffic.
In fact, barge traffic on the canal had been plummeting since 1994, but the Corps left that data out of its study. And barges have continued to avoid the canal since the study was finished, even though they are visiting the port in increased numbers.
Pam Dashiell, president of the Holy Cross Neighborhood Association, remembers holding a protest against the lock four years ago -- right where the levee broke last week. Now she's holed up with her family in a St. Louis hotel, and her neighborhood is underwater. "Our politicians never cared half as much about protecting us as they cared about pork," she said.