Originally posted by Hornet33
The 747 was a private Boeing project and they came in under budget and ahead of schedual
Are you sure about that? I think you need to think about that one more time before you talk using big words
"The massive cost of developing the 747 and building the Everett factory meant that Boeing had to borrow, and gambled its very existence on the 747's success; had the project failed, it would have taken the company along with it.[7] Initial problems with the JT9D's development forced Boeing to delay deliveries up to year, and as a result up to 30 planes at one time were left stranded at the Everett plant, with the company on the brink of bankruptcy.[8]"
http://en.wikipedia.org/wiki/Boeing_747